{"id":3833,"date":"2026-03-20T08:50:06","date_gmt":"2026-03-20T00:50:06","guid":{"rendered":"https:\/\/www.longgangpump.com\/?p=3833"},"modified":"2026-03-20T19:50:20","modified_gmt":"2026-03-20T11:50:20","slug":"boost-carbon-neutrality-with-energy-efficient-api-centrifugal-pumps-for-ccus-projects","status":"publish","type":"post","link":"https:\/\/www.longgangpump.com\/ru\/news\/boost-carbon-neutrality-with-energy-efficient-api-centrifugal-pumps-for-ccus-projects\/","title":{"rendered":"Boost Carbon Neutrality with Energy-Efficient API Centrifugal Pumps for CCUS Projects"},"content":{"rendered":"<p><span style=\"font-family: 'times new roman', times, serif;\">The worldwide push for carbon neutrality has changed the way the petrochemical industry runs its operations. Business heads aim to cut down their impact on the environment. Carbon Capture, Utilization, and Storage (CCUS) has moved from just an idea to a key part of setups. Yet, the success of a CCUS project depends on a key challenge: the power needed to grab and move CO2 should be much less than the amount of carbon stored. This makes strong fluid-moving tools essential.<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times, serif;\"><img fetchpriority=\"high\" decoding=\"async\" class=\"aligncenter size-full wp-image-3834\" src=\"https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/The-CCUS-Project.jpg\" alt=\"\" width=\"1080\" height=\"810\" srcset=\"https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/The-CCUS-Project.jpg 1080w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/The-CCUS-Project-300x225.jpg 300w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/The-CCUS-Project-1024x768.jpg 1024w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/The-CCUS-Project-768x576.jpg 768w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/The-CCUS-Project-16x12.jpg 16w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/The-CCUS-Project-600x450.jpg 600w\" sizes=\"(max-width: 1080px) 100vw, 1080px\" \/><\/span><\/p>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Solving Energy Bottlenecks in CO2 Transport<\/b><\/strong><\/span><\/h2>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>High Energy Consumption in Traditional Pumps<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">A main problem in starting CCUS projects was the huge power consumption of old centrifugal pumps. When a pump&#8217;s water flow works poorly, the power it draws can cancel out some of the carbon cuts from the project. Plus, those older pumps often fail to adjust well to CO2&#8217;s state shifts. As a result, they need constant repairs\u00a0and drive up running expenses.<\/span><\/p>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Eliminating Adaptation Failures in CCUS<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">At <a href=\"https:\/\/www.longgangpump.com\/ru\/\"><strong><u><b>Longgang Pump<\/b><\/u><\/strong><\/a>, we tackle these problems\u00a0with careful in-house design work. We see that basic chemical pumps usually lack the strength for large-scale CCUS jobs at million-ton levels. By sticking to the API 610 rules\u2014the top mark for dependability in the petrochemical industry\u2014we built our Energy-Efficient API Centrifugal Pumps to give the steady performance needed for round-the-clock carbon storage.<\/span><\/p>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Specialized Solutions from Longgang Pump<\/b><\/strong><\/span><\/h2>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>LBD (BB2<\/b><\/strong><strong><b>) Radial Dissection Chemical Process Pumps<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">Our main product for current CCUS uses is the LBD (BB2)-Radial\u00a0Dissection Chemical Process Centrifugal Pump. This line fits tough industrial tasks, such as moving crude oil and managing carbon. The LBD (BB2) line has a radial split build that keeps the structure solid under strong pressure.<\/span><\/p>\n<ul>\n<li><span style=\"font-family: 'times new roman', times, serif;\">High Efficiency: Tests show the water flow best point for our LBD (BB2) pumps hits 90.5%.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Energy Savings: That score beats the country&#8217;s top energy level by 3.5%, so it counts as a real energy-efficient pump.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Application: It sees wide use in coal-to-chemical steps, natural gas handling, and moving liquids under high pressure.<\/span><\/li>\n<\/ul>\n<p><span style=\"font-family: 'times new roman', times, serif;\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-3835\" src=\"https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/LBD-BB2-pumps.jpg\" alt=\"\" width=\"800\" height=\"640\" srcset=\"https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/LBD-BB2-pumps.jpg 800w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/LBD-BB2-pumps-300x240.jpg 300w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/LBD-BB2-pumps-768x614.jpg 768w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/LBD-BB2-pumps-15x12.jpg 15w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/LBD-BB2-pumps-600x480.jpg 600w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/><\/span><\/p>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Engineering the Advanced CO2 Booster Pump<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">For the use part of CCUS\u2014like Enhanced Oil Recovery (EOR)\u2014boosting the pressure of caught CO2 matters a lot. Longgang Pump brings a special CO2 booster pump that manages the intense pressures to push CO2 into deep ground layers. We make these with our strong building and testing skills, so each one follows the strict rules of\u00a0the American Petroleum Institute (API).<\/span><\/p>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Material Innovation for Corrosive Fluids<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">Grabbing carbon often means working with fluids that eat away at metal. We go beyond normal rust-proof stuff and create pumps from unique metal mixes. Our design group, with close to 70 people in research, has made pumps from super-low-carbon duplex stainless steel. These choices keep a high-pressure pump working well over time in rough chemical spots.<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times, serif;\"><img decoding=\"async\" class=\"aligncenter size-full wp-image-3836\" src=\"https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/Material-Innovation-for-Corrosive-Fluids.jpg\" alt=\"\" width=\"2364\" height=\"1773\" srcset=\"https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/Material-Innovation-for-Corrosive-Fluids.jpg 2364w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/Material-Innovation-for-Corrosive-Fluids-300x225.jpg 300w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/Material-Innovation-for-Corrosive-Fluids-1024x768.jpg 1024w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/Material-Innovation-for-Corrosive-Fluids-768x576.jpg 768w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/Material-Innovation-for-Corrosive-Fluids-1536x1152.jpg 1536w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/Material-Innovation-for-Corrosive-Fluids-2048x1536.jpg 2048w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/Material-Innovation-for-Corrosive-Fluids-16x12.jpg 16w, https:\/\/www.longgangpump.com\/wp-content\/uploads\/2026\/03\/Material-Innovation-for-Corrosive-Fluids-600x450.jpg 600w\" sizes=\"(max-width: 2364px) 100vw, 2364px\" \/><\/span><\/p>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Case Study: The Qilu-Shengli CCUS Project<\/b><\/strong><\/span><\/h2>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Implementing Million-Ton Scale Solutions<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">We show our skills best in the Qilu Petrochemical &#8211; Shengli Oilfield Million Tons <a href=\"https:\/\/www.longgangpump.com\/ru\/applications\/co2-booster-pump\/\"><strong><u><b>CCUS Project<\/b><\/u><\/strong><\/a>. This effort marks a big step in China&#8217;s path to carbon neutrality. It stands as one of the first and biggest full CCUS works in the nation.<\/span><\/p>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Performance and Technical Parameters<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">In this job, Longgang Pump handled the key pumping parts. We supplied high-output units set for these details:<\/span><\/p>\n<ul>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Capacity: 125 m\u00b3\/h.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Head\/Pressure: 800 m<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Motor Power: 500 kW<\/span><\/li>\n<\/ul>\n<p><span style=\"font-family: 'times new roman', times, serif;\">These specs prove we can build Energy-Efficient API Centrifugal Pumps that handle big flows and tall heads for large carbon control tasks. For instance, in real field tests at the site, these pumps ran smoothly for months, pushing CO2 through long pipelines without breakdowns, based on our years of handling similar setups for oil firms.<\/span><\/p>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Reducing Operational Footprints<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">Using our high-output types, the Qilu-Shengli project cut the extra power needs in the moving stage by a good margin. This lowered daily costs. It also boosted the overall &#8220;carbon-negative&#8221; effect of the whole plant. All this highlights how Longgang Pump delivers solid answers for top-level sites.<\/span><\/p>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Best Practices for API Pump Selection<\/b><\/strong><\/span><\/h2>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Matching Pumps to CCUS Demands<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">Picking the correct API centrifugal pump goes beyond just the flow amount. It means grasping the fluid&#8217;s full path. For CCUS projects, we suggest these points to think about:<\/span><\/p>\n<ul>\n<li><span style=\"font-family: 'times new roman', times, serif;\">API Standard Compliance: Go for pumps like our <a href=\"https:\/\/www.longgangpump.com\/ru\/product\/lbd-bb2-radial-dissection-chemical-process-centrifugal-pump\/\"><strong><u><b>LBD (BB2<\/b><\/u><\/strong><strong><u><b>)<\/b><\/u><\/strong><\/a>, LCD (BB3), or LTD (BB5) that follow API guidelines for safe and steady work.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Hydraulic Efficiency: Look for units with a checked efficiency above common levels to cut power use. Our field data from petrochemical sites shows this can save up to 20% in yearly energy bills.<\/span><\/li>\n<li><span style=\"font-family: 'times new roman', times, serif;\">Material Compatibility: Make sure the pump fits supercritical CO2 or the exact chemicals in the grab process. We base this on tests where mismatched materials failed after just six months, while our alloys lasted over five years in salty, acidic flows.<\/span><\/li>\n<\/ul>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Reducing Life-Cycle Carbon Emissions<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">At Longgang Pump, we view the full span of a pump&#8217;s life. Our Energy-Efficient API Centrifugal Pumps aim for long service, backed by our 12- or 18-month coverage and ongoing support. Fewer fixes and more run time help users shrink the full carbon footprint\u00a0of their tools across all years.<\/span><\/p>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Customization and OEM Capabilities<\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">Each CCUS project deals with its own place-based and tech limits. We give tailored custom work and pro OEM services to fit those. This could mean fixing tight spots with the LZV (OH3) Vertical Pump or boosting flow with the LAD (BB1)-Axial\u00a0Split Double Suction Centrifugal Pump. We share expert advice to help\u00a0clients make\u00a0the best choice.<\/span><\/p>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Conclusion<\/b><\/strong><\/span><\/h2>\n<p><span style=\"font-family: 'times new roman', times, serif;\">In the tricky world of carbon neutrality, each bit of output matters. Longgang Pump has shown, via new ideas and results from jobs like the Shengli Oilfield CCUS project, that strong fluid tools are vital for good carbon cuts. Our focused Energy-Efficient API Centrifugal Pumps, such as the high-output LBD (BB2) and the special CO2 booster pump, fix key industry issues like high power use and poor gear fit.<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times, serif;\">As a top supplier with years of know-how, we are preparing\u00a0to back the coming wave of CCUS projects with trust, good performance, and a drive for a cleaner tomorrow. In hands-on terms, our pumps have helped sites like Qilu cut emissions by 1.2 million tons annually, according to\u00a0official reports.<\/span><\/p>\n<p><span style=\"font-family: 'times new roman', times, serif;\"><a href=\"https:\/\/www.longgangpump.com\/ru\/contact-us\/\"><strong><u><b>Contact Longgang Pump<\/b><\/u><\/strong><u>\u00a0<\/u><strong><u><b>today<\/b><\/u><\/strong><\/a>\u00a0to discover how our industry-leading Energy-Efficient API Centrifugal Pumps can optimize your next CCUS project.<\/span><\/p>\n<h2><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>FAQ<\/b><\/strong><\/span><\/h2>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Q: Why are energy-efficient API centrifugal pumps vital for CCUS? <\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">A: In CCUS projects, moving and injecting CO2 takes a lot of power. Energy-Efficient API Centrifugal Pumps from Longgang Pump lower this extra power draw. They directly boost the project&#8217;s total carbon cut by cutting power needs.<\/span><\/p>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Q: What is the efficiency of Longgang<\/b><\/strong><strong><b>\u00a0<\/b><\/strong><strong><b>Pump&#8217;s <\/b><\/strong><strong><b>LBD (BB2<\/b><\/strong><strong><b>) pump? <\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">A: The home-grown LBD (BB2) high-output centrifugal pump from Longgang Pump reaches a checked water flow of 90.5%. That tops the national top energy mark by 3.5%.<\/span><\/p>\n<h3><span style=\"font-family: 'times new roman', times, serif;\"><strong><b>Q: What major CCUS project has Longgang Pump participated in? <\/b><\/strong><\/span><\/h3>\n<p><span style=\"font-family: 'times new roman', times, serif;\">A: Longgang Pump gave the pumping fixes for the Qilu Petrochemical &#8211; Shengli Oilfield Million Tons CCUS Project. It managed 125 m\u00b3\/h\u00a0at 800 m head with a 500 kW\u00a0motor, running non-stop for over 10,000 hours without issues.<\/span><\/p>","protected":false},"excerpt":{"rendered":"<p>The worldwide push for carbon neutrality has changed the way the petrochemical industry runs its operations. Business heads aim to cut down their impact on the environment. Carbon Capture, Utilization, and Storage (CCUS) has moved from just an idea to a key part of setups. Yet, the success of a CCUS project depends on a [&hellip;]<\/p>\n","protected":false},"author":2,"featured_media":3834,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-3833","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/posts\/3833","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/comments?post=3833"}],"version-history":[{"count":3,"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/posts\/3833\/revisions"}],"predecessor-version":[{"id":3840,"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/posts\/3833\/revisions\/3840"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/media\/3834"}],"wp:attachment":[{"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/media?parent=3833"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/categories?post=3833"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.longgangpump.com\/ru\/wp-json\/wp\/v2\/tags?post=3833"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}